TL;DR: This Company of Heroes 2 Soviet build order uses a surviving Combat Engineer and Conscript capture core, then adds the support the opponent makes necessary. A practical learning sequence is Support Weapon Kampaneya, three Conscripts, a relevant support team, infantry recovery and the Tankoviy Battalion transition. Choose the counter before an optional extra squad.
Use Special Rifle Command instead when you intend to build around its Penal, sniper or M3 roles. Both opening structures lead toward the next vehicle stage, but their immediate tools differ. The 2021 revision combines Molotov and anti-tank-grenade access into one HQ Grenade Package; that research and the abilities’ later spending are separate jobs.

Sources and scope: Unit access and roles use the Soviet unit guide, corrected by the 2021 patch record. General resource and recovery rules use Tomy’s beginner guide. The examples assume normal multiplayer resources and stock units. Checked November 9, 2026; archived prices and exact arrival times are excluded.
On this page
Company of Heroes 2 Soviet build order: the first action sequence
Give the Combat Engineer the chosen construction task while recruiting the infantry that will capture. In this support-opening example, build Support Weapon Kampaneya and use three Conscripts as the practice capture core. The squads should leave for useful sectors while production continues, not wait together at headquarters for the entire army.
Assign one Conscript to the connecting territory, another toward useful cover near a contested point and the third to a supporting or nearby capture route. When the engineer finishes construction, send it to a suitable support task. Its repairs, construction and mine-related tools remain useful later.
Add the first support team from the obstacle you see. Maxim supplies infantry control, the mortar pressures or screens a fixed approach and ZiS-3 supplies the anti-vehicle function. You do not need to buy all three before reassessing recovery and the next tech step.
| Stage | Action | Decision trigger |
|---|---|---|
| Start | Build the selected first structure; recruit capture infantry | The intended T1 or T2 roles |
| First contest | Add the required support | Infantry pressure, fixed gun or vehicle |
| Recovery | Heal and reinforce survivors | Injuries and missing models |
| Vehicle transition | Construct Tankoviy Battalion Command | Connected income and a funded unit plan |
| Later armor | Construct Mechanized Armor Kampaneya | The required next role after T3 |
1. Choose T1 or T2 for different tools
Special Rifle Command supplies the sniper, M3 Scout Car and Penal Battalion roles. A Penal-oriented opening asks those infantry to provide the core fighting presence, with the engineer and other squads handling supporting capture. The sniper and scout car are additional choices, not compulsory purchases in every T1 opening.
The revised Penal PTRS upgrade provides an anti-tank role, but replacing rifles changes the squad’s infantry contribution. Choose it when the vehicle threat justifies that change. Do not equip every Penal automatically and then expect the army to retain the same anti-infantry arrangement.
Support Weapon Kampaneya supplies Maxim, mortar and ZiS-3. This makes the example’s Conscript core easy to combine with separate suppression, indirect fire or anti-tank tasks. Choose the first tool from the enemy position rather than queuing the full list because the building offers it.
Avoid paying for two openings without a reason
Building both T1 and T2 can provide additional tools, but each purchase competes with recovery and the next transition. If T2 already supplies the role solving the current fight, another opening structure can delay the light vehicle or later armor you intended to field.
If a T1 force needs a supported anti-tank gun, the T2 investment can be justified by that missing function. Name the reason before adding the building. Access to more units is useful when those units answer a specific problem, not merely when the roster looks incomplete.
2. Build Conscript utility and recovery separately
The HQ Grenade Package unlocks both Molotovs and anti-tank grenades in the 2021 arrangement. The older guide describes separate purchases; use the combined access for this plan. Unlocking the package does not remove the munitions needed when you later use an ability.
Molotov access supplies a way to pressure an infantry position, while anti-tank grenades provide support against vehicles under their conditions. Neither replaces a properly positioned anti-tank weapon when armor controls the approach. Keep the weapon purchase and the infantry’s useful supporting task in the budget.
HQ healing restores injuries on surviving models. Reinforcement supplies missing soldiers for manpower. Complete both recovery jobs when needed before sending the squad back. A restored model count beside injured survivors is not the same as a fully recovered infantry force.
Use merge as a transfer with a purpose
Conscripts can merge models into eligible infantry or support crews. Use that transfer when preserving a useful recipient’s presence matters, then count what the donor now lacks. It does not create free extra soldiers for the army or remove the donor’s later recovery task.
Do not send the depleted donor to repeat a demanding assault immediately afterward. Give it a safe supporting job or recover it. The transfer helps the opening only when the recipient’s continued work and the donor’s preservation support the next engagement together.
Preserve the purchase reserve
Estimate essential reinforcement before buying an optional fourth Conscript or another support unit. Repeated model losses consume the manpower needed alongside fuel for tech and vehicles. A connected fuel lead can still produce delayed armor when recovery absorbs the other required resource.
Change the losing engagement as part of recovery. Use appropriate cover, another direction or supporting pressure before returning the same squads. Replenishing them and repeating an unchanged frontal attack simply creates another bill.
Work a recovery-versus-counter budget
Assume illustrative costs rather than current unit prices: you hold 520 manpower, essential model replacement costs 80 and the needed gun costs 320. Recovering and buying that counter leaves 120. Buying an optional 240-manpower squad first leaves only 200 after recovery, delaying the weapon that answers the vehicle.
The cheaper-looking infantry addition can therefore postpone the stronger practical response. Preserve the current squads, restore those needed to observe and screen, then fund the missing role. Extra infantry becomes a later choice once the supported counter reopens the route.
If the repeated recovery bill comes from crossing the same machine-gun arc, the budget also needs a tactical correction. Reserve the useful mortar or flanking task and change that approach before sending the recovered units back. Otherwise the next round of missing models can consume the spare manpower before your planned vehicle purchase.

3. Give each support unit a protected job
Maxim controls an infantry approach through suppression. Place it with useful sight and infantry protecting the side. Do not ask one machine gun to defend every route while the entire capture force leaves it alone at the contested point.
The mortar provides damage pressure and smoke. Use a barrage against a fixed support position or a screen for a planned movement, with infantry ready to use the opening. Keep the crew behind a supported line and relocate when the opponent repeatedly targets its position.
ZiS-3 provides the anti-vehicle role. Face it toward the relevant route, provide observation and protect the crew from infantry. Its withdrawal uses normal movement rather than rifle-squad Retreat, so leave room and support for a relocation before the enemy surrounds it.
Keep the engineer connected to support
The Combat Engineer remains useful for repairs, construction and mine-removal work where equipped. Preserve it through the opening instead of treating it as expendable combat infantry. Losing the builder can delay the recovery of a vehicle you spent several stages preparing.
When the front moves, reassign the support positions. A gun covering the old road or a mortar too far from the active fight may no longer help the capture core. Advance observation and protected positions before bringing fragile crews into the new area.
4. Fund the T3 and T4 transition
Tankoviy Battalion Command follows one of the first structures, Special Rifle Command or Support Weapon Kampaneya. Its options include M5, T-70 and SU-76 roles. Building the structure does not automatically buy those units, so reserve resources for the selected production as well.
T-70 supplies light anti-infantry and reconnaissance work, while SU-76 offers another vehicle and support role. The M5 can provide transport and reinforcement functions in its basic arrangement, with a conversion changing its task. Choose one from the current army’s need rather than buying the whole stage automatically.
Mechanized Armor Kampaneya requires Tankoviy Battalion Command and supplies the later armor choices. T-34/76 offers a general medium-tank role, SU-85 an anti-vehicle role and Katyusha indirect pressure. Those choices still need observation, screening and protection after production.
Decide whether the light vehicle earns its delay
An optional T-70 is useful when its infantry-pressure role helps hold the connected ground. It can be a poor priority when the enemy’s medium armor is the urgent threat and your current force already controls infantry. Keep the immediate anti-tank role available while planning the later response.
Skipping an optional unit purchase is different from skipping a required structure. Follow the documented T3-to-T4 chain while choosing which field units are worth funding. This preserves a legal transition without forcing every build to contain the same vehicle.
5. Work through infantry and vehicle-pressure openings
Assume a hypothetical normal-resource match where the opponent mainly shows infantry and a machine gun near the contested route. Use the Conscript capture core and T2 support. Keep one squad in useful cover, use another approach or mortar smoke and recover the survivors before adding an optional unit.
When the defender moves, capture the connector or relevant VP instead of pursuing every retreating model. A Maxim can control the return approach while the other infantry maintains income. Advance toward T3 only with the required structure and a clear next-unit role in mind.
Now change the assumption: an enemy light vehicle repeatedly forces the Conscripts away. Prioritize the available ZiS-3 function and protect it with recovered infantry. Prepare the HQ grenade access when useful, but do not make unsupported infantry chase the vehicle as the army’s only response.
Once the route stabilizes, reassess the next vehicle. A T-70 bought solely to repeat anti-infantry work does not address the demonstrated armor problem. Choose the T3 and later T4 investments from what the force still lacks, preserving repairs and the crew screen.
Diagnose a delayed Soviet opening
If fuel income is low, inspect the connector before expanding farther. If manpower is scarce, count recurring casualties and optional purchases. If every squad pins, change the machine-gun approach instead of buying another Conscript for the same route.
If a support weapon contributes little, review facing, observation and protection. If the later tank arrives alone, recover the force needed to support it. The sequence works when purchases and battlefield jobs remain connected through the match.
Soviet build questions
Is the three-Conscript opening mandatory?
No. It is the practice core used here. A Penal plan or earlier support can change the count; choose from the roles needed rather than buying another squad by habit.
Are Molotovs and anti-tank grenades separate tech purchases?
The 2021 revision combines them in the HQ Grenade Package. Activation resources and battlefield conditions remain separate from researching that access.
Must I buy a T-70 before later armor?
The optional unit purchase is different from the required structure chain. Fund the vehicle only when its role improves the current army while following the documented T3-to-T4 requirements.
Where should I practice the next decision?
Use the Company of Heroes 2 guides and strategy game guides. In the next match, name one observed threat, one legal purchase and the infantry task that will support it.


